What ten weeks looks like: a plan for automating one workflow
A workable plan for automating one workflow: two weeks watching, two weeks measuring and scoping, four weeks building, two weeks rolling it out — then a period of keeping an eye on it. The weeks are a planning template, not a promise. The first two phases feel like nothing is happening, and they decide whether the rest works.
Written by Josh Soderblom, founder of ikonic303.
Use this two ways: as a plan if you are automating a workflow yourself, and as a checklist if someone is building it for you, so you can tell when a phase is being skipped. The week counts are a starting point for planning. A single small task can take far less; adjust the weeks to the size of the job and keep the order.
Weeks 1–2 — Watching
What it looks like: sitting with the people who do the work, following jobs from start to finish, timing things, asking several people the same question.
What it feels like: slow, and slightly uncomfortable. Nothing is being built, and nobody enjoys being watched at first.
What it is for: finding the gap between the process as written down and the process as it really happens. You cannot see that gap from a meeting.
A useful question to ask in this phase: “What part of this do you dread?” People find it hard to say what is inefficient. They can usually tell you what is infuriating, and it is worth checking whether those are the same thing.
Weeks 3–4 — Measuring and scoping
What it looks like: payroll numbers, exports from your systems, timestamps, and arithmetic. The cost worksheet →
What comes out: one number — what the workflow costs a year — plus a written percentage of it that could realistically be removed, plus a short description of what will be built.
What it needs: the real numbers, and the person who can act on them in the room when they are shown.
Weeks 5–8 — Building
What it looks like: building, with a regular session where the work in progress is run against real data with someone who does the job.
What is being built: the connections between systems, the logic, the screens, and the handling for the odd cases. Plan for the odd cases to take more of the time than the straightforward path.
What it needs: steady time each week from one person who does the job. Not a committee. One person, consistently — ideally the one with the most complaints about the current way.
Leave room for surprises: an existing system that does not behave the way its instructions say. That is the reason to plan four weeks here rather than two.
Weeks 9–10 — Rolling it out
What it looks like: standing next to people while they use it on real work.
What it feels like: tense. Things surface. Someone has a type of job nobody mentioned. Someone does not want to change.
This is normal and it is the point. The first contact with real work is where you learn what you got wrong, and it is why whoever built it should be in the room.
When this phase is done: the team runs a full cycle through the new system without help.
After — Keeping an eye on it
A system does not usually fail loudly. Someone hits an odd case, goes back to the old way for that one job, tells a colleague, and some time later everyone is back on the spreadsheet.
So in the weeks after rollout, watch usage, not whether the software is running: what people actually do, what makes them avoid it, and the seasonal cases you could not see at the start.
If someone built it for you, handover should be an event. Written notes, training, every login in your name, and a written list of what will break it. Who owns the system →
What can make it longer
- Access. If the people who do the work are unavailable, week one stretches.
- Systems nobody remembers setting up. An old connection with no notes adds time.
- Adding things during the build. “While you’re in there” is how a short project becomes a long one.
- A process nobody may change. If nothing may change, the project shrinks in value and grows in argument.
What should make you suspicious of a builder
- A price before any measurement. A number produced from one conversation is a guess.
- No watching phase. Anyone jumping to solutions on day one is building for the process as written down.
- The work ending the day it is switched on. Getting people to use it then becomes your problem.
- A promise of a finished system in a few days. That is a prototype. Prototypes are fine — just do not mistake one for something your business can rely on.
Running this plan yourself
An owner can run every phase above. The watching and measuring need no technical skill at all, and for one well-defined task the building can be done with an AI coding assistant. Our AI classes for business owners are hands-on sessions where owners work in Claude Code on tools for their own businesses, and the Build Your Own Command Center course goes further. If you would rather have it built, see small AI tools for one task.
AI classes for business owners → · Why AI pilots die →
Which workflow to automate first · Why AI pilots die · Measuring the return on an automation · AI classes for business owners
Get in touch
Email solutions@ikonic303.dev to get the next AI class date, to talk about marketing, or about one AI tool or job you want built. ikonic303 is based in Colorado, and classes are held in the Denver metro.
ikonic303 home · AI classes · what we built · free Anthropic courses · contact